So you want to build a new luxury master bathroom. You're spending more time at home post pandemic. Further, your existing master bathroom is getting old. Let me share the true cost of building a luxury master bathroom after building a couple of main bathrooms before.
Despite my frugal nature, there is one area where I feel no guilt spending a large amount of money: everything housing related!
We spend roughly half our lives in our house. Maybe even more post pandemic. Why shouldn't we buy the best mattress to sleep on or pay up to rent a beautiful house with a balcony overlooking the water?
After going through an unpleasant roommate situation when I first moved to San Francisco in 2001, I decided to “live it up” by getting my own $1,800 a month one bedroom in a nice part of town.
Living in a craptastic place for years in order to save money to one day live a better life seems a little backwards. You don't have to spend $100,000+ a year to rent a nice place. But if you're over 30 years old, perhaps the days of living like a college student are over!
This post highlights the true cost of constructing a dream master bathroom. Every year, the cost of building a master bathroom goes up due to inflation. Mine was really an expansion instead of a remodel, since the bathroom went from 36 square feet to roughly 170 square feet.
Deciding On Building A Luxury Master Bathroom

After purchasing my fixer in Golden Gate Heights I had a choice between finally buying a nice car to replace Moose, my decrepit 14 year old Land Rover with a lit up dashboard full of warning lights. Or I could upgrade my incredibly crappy 6 feet X 6 feet bathroom from the 1950s and own a cheaper new car instead.
Oh, the curse of not having an endless amount of money to spend!
Instead of spending ~$66,000 out the door for a sweet new Range Rover Black Series Evoque, I decided to build a new luxury master bathroom.
Not only was building a luxury master bathroom a necessity, it was also a wiser financial move. My goal was to turn my 36 sqft master bathroom into a 175 sqft master bathroom with all the amenities.
My Rational For Luxury Master Bathroom vs. New Luxury Car
1) Cars are guaranteed to depreciate, housing is not. Therefore, spend the least amount possible on a depreciating asset, and the most amount possible on a potentially appreciating asset. This is the principle of the Financial Samurai Fiscal Responsibility Ratio.
2) Building more livable square footage is one of the best ways to make money in real estate. Don't confuse remodeling with expansion. Always look for property that has expansion potential. Many people have trouble visualizing how awesome things could be.
3) After remodeling the upstairs with a new kitchen, bathroom, paint, windows, and hardwood floors, the downstairs needed to be updated in order to match the overall quality of the house.
4) At my former residence, I spent 1-3 hours every other day in the jacuzzi working online. It was the best home office possible! I spend way less time in a car, especially now that I don't have to commute M-F to a day job downtown.
5) I found a “capable” licensed contractor who bid a reasonable price of $15,500 for the rough, and $8,500 for the finishings over a two month period. We all know that initial bids are low in order to gain business, but even a 50% overage to $38,000 was OK since I was adding 140 square feet that is valued at ~$120,000 (neighborhood is going for ~$850/sqft X 140 sqft).
What My Old Master Bathroom Looked Like
My old bathroom had a small sink, an old toilet, and a shower that was so tiny you could barely turn around or bend over. It was also on a weird one foot raised platform, a short cut way to install the plumbing so the builder didn't have to break concrete. The total size was only 36 sq ft.



As you can see from the third picture, there really wasn't any room to maneuver in my old bathroom. The L-shaped pipes hugged the outer border of the walls. This was a bathroom where you wanted to do your business and get out as quickly as possible.
What I wanted to create was a place where I could hang out for hours. Maybe I could host a hot tub party with some wine and cheese? Or maybe we could have a Wet N' Wild shower adventure? Having a private toilet stall with a heated seat is a newspaper reading man's dream! Let's see if I could make this dream a reality.
Construction Of A New Luxury Master Bathroom
The plan was to start the bathroom demolition and construction on Feb 1 and finish by April 1. To meet this estimated time frame, my contractor would employ two helpers and work with them for most of the time.
Unfortunately, my unreliable contractor would disappear for a week at a time, busy chasing other business while his helpers would do some things wrong and have to correct.
San Francisco code requires there to be 18 feet of distance between the garage entrance and a back wall. If there wasn't such a code, I'd probably expand by another foot closer to the garage door for 10-15 more livable feet. Even a Chevy Suburban is not longer than 16 feet.









Finished Luxury Master Bathroom
After five months (three months LONGER than expected), the master bathroom finally passed plumbing, electrical, and final building inspection on June 30, 2015!
If I were to build a new luxury master bathroom in 2023, it would probably take 35% longer due to high demand and backup at the Department Of Building Inspection.








The Finest Custom Finishing In My New Master Bathroom
Not bad huh? I literally created everything I wanted in a master bathroom: double wide rain showers, deep soaking jacuzzi for two, a private toilet stall with Toto washlet/bidet that has a seat warmer, double vanity, and a custom closet with a pull out shelve for double laundry baskets. Obviously you need that right?
I used Spanish porcelain tiles for the floors that look like wood, and similar color porcelain tiles with a different pattern for the wall to create the spa-like feeling at a luxury resort I visited. The main landing area is large enough to put a queen size bed if I suddenly have massive amounts of children.
All recessed lights are dimable in order to create different moods. I chose translucent doors to bring in more natural light. The translucent window over the hot tub was strategically positioned for ventilation and natural light as well. The bathroom has two electrical vents, one in the main area with a heater and one in the toilet stall.
It was an incredible amount of fun coming up with the design and picking out the fixtures. If you're a creative person, home remodeling can be quite a rewarding experience as you go from concept to finished product.
Now on to the cost of construction. Will I stay within my mental budget of $57,000 given my contractor went over by 90 days? Let's see!
The True Cost Of Building A Luxury Master Bathroom
At 170 square feet, the master bathroom is relatively large. Most master bathrooms I see are under 120 square feet. Most master bathrooms don't have tile all the way up to 9 foot ceilings either.
Since it cost the same to install a $500 shower head vs a $100 shower head, I decided to get the best finishes possible. The custom cabinetry for the double vanity and closet took a lot more time than expected.

As you can see from the meticulous spreadsheet, I actually stayed within budget with a total cost of $55,214.32! Add up all the line items, not just the line items in bold to get to $55,214.32.
Bathroom Could Have Cost Even More
With such a long delay in construction, I thought surely I'd be on the hook for more. In fact, my contractor used the classic line that all contractors use, “If I start calculating how much money I've lost on your project…….” to try and guilt me into paying more. Don't fall for this line folks. Stand strong!
I had no sympathy because he and his crew hardly did any work for the entire 3.5 weeks I was in Asia. Instead, the contractor let slip one day that he ended up building a whole restaurant during the time he was supposed to build my bathroom, even though he told me he had no other projects he was working on. WTF. He used the excuse that his helpers were injured as the reason why they didn't work. What was daily work became visiting once a week for a couple hours at a time.
The good thing about my contractor is that he didn't argue when I told him we would be sticking to the budget in the contract. He knows that I've got other potential projects for him to do, like building a couple decks, and maybe expanding my rental house, so he has to stay relatively honest. Dangling future projects is one of the best ways to keep a contractor from taking advantage of you.
Extra Necessities For The Luxury Master Bathroom
There are two items I didn't highlight in my main spreadsheet, but that are in my “Side Projects” tab I should mention. The first is spending $2,150 to upgrade my main water line from the street to a 1.5 inch pipe from 3/4 inches given my new bathroom has so many more pipes. A 1.5 inch pipe is there so I can build another full bathroom in the future if I'm crazy. Might as well prep the house for expansion potential.
I also spent $1,050 to create a new drain in my garage while they were already trenching. The drain is there in case the washer pipes burst. Or if any of the bathroom pipes burst and leaks into the garage. If I add these two costs together, then my total bathroom cost is roughly $58,414.32. This is $1,414.32 over my mental budget of $57,000.
Related: Why Home Remodeling Always Takes Longer And Costs More Than Expected
Value Is In The Eye Of The Beholder
Spending $58,414 on a new master bathroom might sound ridiculous to you. However, for me, I think it's one of the greatest values ever. In comparison, $58,000 is the out-the-door cost of a BMW 3.35 series or an Audi A4 3.0 sedan. Neither of which bring me any value.
Although, if I try and think how many awesome vacations for two $58,000 could buy, then the bathroom seems more expensive. But, by building this bathroom and creating an extra 140 square feet of living space, I think I've easily created an extra $120,000 in value to the house.
How Much The Luxury Master Bathroom Added To Value Of The House
I've had three realtors come by the house since the bathroom construction was finished. One of their goals was to guesstimate how much such a bathroom construction would cost. One said $90,000. The other two said “around $100,000.”
I then had a construction foreman come over to install a new vanity and sink in my remodeled upstairs bathroom. He said his construction company would charge $70,000 for just the rough. Rough does not include plumbing, electrical, permits, and finished materials. He estimated $150,000 – $170,000 all-in!
Although my builders were slow, they were a good deal in expensive San Francisco.
How much you spend on a construction project largely depends on how much your home is worth. A good rule of thumb is to spend no more than 5% of the market value of your house on a master bathroom remodel. For example, if you have a $300,000 house, spend $15,000 on a master bathroom. If you have a $2 million house, spend $100,000 on a master bathroom max.
You want to spend within the scope of your neighborhood. Building the fanciest home on the block doesn't bring the best financial return if you ever sell. Given how long it takes and how much it costs to build a luxury master bathroom, I suspect fully remodeled homes will sell for greater premiums going forward.
Emotional Cost To Constructing A Luxury Master Bathroom

If you've ever taught a loved one how to drive stick shift, take that feeling and multiply it by three to get an idea of the stress involved in building or remodeling anything in your home!
For some reason, contractors will seldom come on time, do things wrong, and ask you for more money. You're constantly feeling cheated, unless you really know your stuff. The process always costs more and takes longer than expected! Even if you are rich enough to hire a project manager to deal with the contractor and sub-contractors, you will still run into a lot of headaches.
If you're in a relationship where your finances are not rock solid, your relationship will be severely tested. Your frustrations will spill over to the ones you love the most. There's nothing worse than feeling like you are being taken advantage of. Contractors can and will hold you hostage.
Please give your loved ones multiple “free passes” to vent. All that anger will pass once you get your project approved!
Invest In Real Estate More Strategically
If you don't want to build a new luxury master bathroom to add value, then don't. Instead, invest in real estate through Fundrise, one of the largest real estate crowdsourcing companies today. Fundrise manages over $3.5 billion and has over 500,000 investors. And you can get started investing in real estate with Fundrise for little as $10.
Real estate is a key component of a diversified portfolio. Real estate crowdsourcing allows you to be more flexible in your real estate investments by investing beyond just where you live for the best returns possible. For example, cap rates are around 3% in San Francisco and New York City. But cap rates are over 10% in the Midwest if you're looking for strictly investing income returns.
Another great private real estate investing platform is Crowdstreet. Crowdstreet offers accredited investors individual deals run by sponsors that have been pre-vetted for strong track records. Many of their deals are in 18-hour cities where there is potentially greater upside due to higher growth rates. You can also build your own select real estate portfolio with Crowdstreet.
I've personally invested $954,000 in private real estate since 2016 to diversify my holdings, take advantage of demographic shifts toward lower-cost areas of the country, and earn more passive income. We're in a multi-decade trend of relocating to the Sunbelt region thanks to technology.

However, you must diversify your portfolio and do your due diligence on all the sponsors. Look up their track record, their management, and whether they have had any blowups before. Although CrowdStreet screens the deals, you have to do your screening as well.
Both platforms are sponsors of Financial samurai and Financial Samurai is a six-figure investor in Fundrise funds.
Subscribe To Financial Samurai
Listen and subscribe to The Financial Samurai podcast on Apple or Spotify. I interview experts in their respective fields and discuss some of the most interesting topics on this site. Please share, rate, and review!
For more nuanced personal finance content, join 65,000+ others and sign up for the free Financial Samurai newsletter. Financial Samurai is one of the largest independently-owned personal finance sites that started in 2009.
I was very excited to study your spreadsheet only to find out the total did not match up 15k plus 8k equals 23k, your bath Reno was 53k, were are the detail records for the missing 30k, it might make your article more interesting and accurate if you provided ALL the data.otherwise enjoyed your article.
No worries John. You have to add up all the line items, not just the two in bold. They are not subtotals. Cheers
Did something quite similar here in NY in the same time frame, taking a big chunk of an adjacent spare bedroom to double the bathroom size. A lot of nice tile, but maybe not as nice and not quite so much of it (we do plan to sell when we retire in less than a decade). No concrete pad, no bidet/toilet thing, linen closet is in the hall outside so that wasn’t a part of it, and got it for just a shade over 30k. It probably didn’t hurt that the contractor was a close relative of a good friend.
With heated under tile floor (my toes thank me so much when I walk in barefoot in the winter), and heated towel racks, really didn’t “feel” the need for a heated toilet seat.
One of those Kohler Numi toilets would have been nice, but I really didn’t want to pay 9k for a toilet that occasionally needs to be rebooted.
The jetted tub, big enough for two (or just me, really stretched out), with the inline heater to keep the water hot, is something I will never, ever, regret.
The author says “I find no joy in spending money on fancy cars or designer labels. In fact, I feel stupid whenever I purchase an item with high profit margins… I’d much rather spend money on experiences.” And in the next breath he says “We spend roughly half our lives in our house. Why shouldn’t we buy the best?” I don’t know, but the “experience” of spending 3 hours a day on Los Angeles freeways is made IMMENSELY more pleasant in an S Class Mercedes than in a Chevy Volt (it would be even better to not have to drive at all, but.). And, although hardly the most expensive, a pair of Allan Edmonds cap toes will not only far outlast (by YEARS) a pair of oxfords from Kohl’s, but feel WONDERFUL on your feet. Now, if you’re talking about blowing money on some V-12 Italian Viagramobile that I can’t even get INTO, I agree with him 100%!
This is a very nice article. posting every detail of the remodeling job and including the cost computation and the final cost of the job. well done!
Your bathroom turned out stunning! WOW! Congrats on staying under budget and even bigger congrats on surviving the stress. I hope that you are enjoying the fruits of your perseverance :).
I just reno’d my kitchen and first floor flooring and I can totally relate to
“contractors will seldom come on time, do things wrong, and ask you for more money. You’re constantly feeling cheated, unless you really know your stuff.” I researched this project for a whole year before pulling the trigger so I did know my stuff, and yet I STILLfelt that way lol. My complaint centers around a sub who lied about his capabilities–ugh–lesson learned.
Beautiful wood look tile you used–I also did grey wood look tile on my entire first floor.
Are you going to be doing your kitchen too? If so I’d love to hear about your plans!!!
Thanks K! I’ve actually done my kitchen already too, but haven’t written a post about it. Opened it up after 65 years of being untouched!
Nice job with your remodel too. It’s really the stress that’s the killer.
Please write about the kitchen!!!
And what about furniture? What style did you furnish your house in?
How long did you have to wait for your permits to be approved? Since you changed the exterior envelope, you had to notify your neighbors, did any of them object?
If you house is over 50 years old, you might have to go to the Historical Preservation review, did you end up doing that?
I am expanding a house in Glen Park and it has already taken 12 months in planning and we aren’t even close to getting our permit yet. Our project is much more extensive than yours though.
I didn’t change the envelope. I just reclaimed 135 sqft of my garage and turned it into a bigger bathroom.
To do an extension and deck would probably take 7-9 months to get approved, which I’m happy to wait and save money for and have more peace and quiet,
How much are you spending on permits, plans, and the final build?
I just had a contractor come last week and guess the bathroom I built would have cost me $150,000 – $170,000 if I went with them!
Be diligent on price as there is a lot of leeway!
Glen Park is hot!
We have been waiting on planning for a year now and now have to do a Historical Review, for an extra $3500 and then resubmit. Our architect expects another six months after that.
His estimate for the whole job is $800,000 and that includes a new foundation to raise it up and 1500 extra square feet total.
We are thinking of waiting until things cool off to do the work though, it is too expensive and too hard to get a good GC right now.
$533/sqft is still much cheaper than buying in Noe(?).
Unfortunately, the $800,000 bid could easily go over $1M. Do not trust initial bids!
Hi Sam,
Congrats, the bathroom turned out great. Thanks for sharing the cost breakdown. Your contractor was cheap! But yeah, dealing with contractors can be very frustrating especially if they don’t charge an arm and a leg.
BTW, did you use a designer or who did your construction and permit drawings, spec finishes & fixtures? I’m a professional Interior Architect + Interior Designer based in San Francisco, CA and doing mostly residential remodels for clients (if anybody on here has a need). I also own a small investment property and I am interested in expanding my portfolio. I signed up for your newsletter and have found your info extremely insightful.
Thank you!
Manuela
MP DESIGN
Did the square footage of your home actually increase or just the size of your bathroom… did you add 140 square feet to your home or did you just increase the bathroom size which now just takes up other square footage of a different area.
Because, if you didnt add square footage to the home then did your value actually increase by ~$120K ($850 x 140)?
Thanks for the insightful article.
Greg
The latter. I converted unlivable space to livable space that gets counted during a sale or purchase while still keeping one car garage.
The next project might be a 700 sqft expansion of new livable space where my back patio is.
I’m absolutely positive the 140sqft in new livable space has created ~$120,000 in value. But, I hope it doesn’t and it won’t for lower property tax purposes. I don’t plan to sell for 10 years, if ever.
Great post, and walk-through of not only the before and after but the steps, thought process, and emotional side of remodeling as well.
That Jacuzzi is one heck of an office. Well done!
Also, interesting how the guy managed to finish a restaurant during that time, when supposedly not doing anything else. At least the finished product turned out really well.
Speaking of remodeling, I have a friend (normally a true cheapskate) whose wife pushed him into doing a $100,000+ kitchen remodel. This in a 3,000 square foot house in a nice but not extravagant suburb. Curious if you think that’s reasonable for a very nice kitchen, or ridiculously expensive as I think it is.
[…] to pay for my master bathroom construction would require me to drive 3,682 hours! That is […]
Sorry about my earlier snarky comment. In all seriousness, you made a great renovation. We just totally re-did our kitchen, putting in a new dishwasher where before none was in place, and replacing the sink and all the cabinets as the earlier ones had mold from a major prior water leak. The new kitchen looks great for a price tag of $20K USD. Next up is replacing all the old windows with modern double insulated German design ones. Price tag is $15K USD. These will both add to our quality of life in the building, not sure how much it will improve the resale value. I guess wait and see for that.
-Mike
Mike – what was your snarky earlier comment? I think I missed it!
It was the one posted at the top of this thread, about a new FS metric talking about the payback of a new bathroom expressed as something like cost per flush (CPF) or cost per bath (CPB).
-Mike
Ah, gotcha.
That is actually something I did when I bought a new 50″ TV 10 years ago. I got the cost of watching a movie for two and divided by the cost of the TV to determine my break even point!
I assign a $30/hour cost for taking a jet bath. Hence, I need to take 1,933 baths to break even! If I take one bath a day for an hour, it will take 5.3 years to break even.
Since my baths often last two hours, I should break even after 3 years!
Excellent. That’s the sort of in depth analysis I was looking for.
I think you have not shown the City permit costs in your illustration.Heard of strict CA permit process, I think its a bit difficult process but its worth considering the Appreciation & value of the property you get compared to depreciation any car!
Check under Permits and Plans: $2,036
Oh ok…Was it stage by stage permit process? I heard you will have to do basic structure, City officials take their own time to inspect & give their nod, then again plumbing, wait for city officials etc..? How many times it took for city officials for permit during the entire process?
Each section, plumbing, electrical, building come 3X to inspect. Can only move forward after each sign off.
Great article! I feel a certain way about my kitchen and am DYING to make it…simply better. It’s old, the vents are useless and the appliances suck. I am going as efficient as possible as I see my current place becoming my rental property within the next 10 years. You mentioned as a formula for a bathroom addition at 5% of the value. What metric would you apply to a kitchen reno? I have a mental picture of what I want to spend, but I would be curious about your thoughts.
We had a master bath like your “before” pics. After living with it for three years, we tore out the whole thing like you did. It took 18 months because I did all the work myself including:
– moved a wall to vastly expand the bathroom space
– add a window
– special ordered Italian tile on floor and walls
– fully enclosed steam shower with three independent shower heads
– Two person jetted tub with in-line heater (my wife stopped using the hot tub)
– built in shelving
– double sink vanity
– dimmable lighting and added electrical outlets (GFCI of course)
And next to it a walk-in closet. Took a long time but I did the whole thing with high end fixtures and finishes for about $20K!
Not bad! How much is your house worth?
Unless you are a licensed electrician in SF, they won’t sign off on it. Where are you located and did you have problems with inspection?
I’m afraid I would do it all wrong and fail inspection. Instead, I spent the time making the $58,000 after tax I knew how during the period instead.
House is worth about $600K. The city inspectors have to sign off on it if it meets code and is done by either a licensed electrician or the homeowner. I grew up with my folks running a contracting biz so I know my stuff (even tho my career has been in IT mgmt and such). Don’t let the contractors tell you otherwise!
…and I take your point about earning the money. I did it in my spare time, for fun and it was! Nothing like building something with the very best available materials to bring simple joy.
PS I’m in suburban Denver.
Gotcha. It was the head of electrical inspection down at the department of planning that told me about the requirement.
Interesting. He was wrong. Their own website sfdbi.org says:
“Homeowners may apply for and obtain permits for work on an owner-occupied single family dwelling. When you need a permit, you can pick up an application at 1660 Mission Street or you may call (415) 558-6088 and we will be happy to mail one to you.
When applying for an electrical or plumbing permit, you may need to demonstrate to the respective division that you have an adequate understanding of the subject in order to perform the work according to applicable codes.”
So a homeowner can pull their own permit and do the work themselves. A lot of inspectors don’t like doing inspections on homeowner work because there do tend to be more errors requiring them to write up the problems and then return visits for reinspections. But, it is your right as an owner to do your own work.
We can pull the permit, but they are notorious for not approving the work if you aren’t licensed and can’t answer some of their many questions.
How much did your permits cost?
Nice office. ;-)
Btw, did you look into the cost of adding radiant heating to the bathroom flooring? Was wondering how much that would cost. Who doesn’t like a warm floor in the winter?
B/c the bathroom is on the ground floor, it would require breaking too much concrete and cost too much extra $$$ I think.
There’s a nice ceiling heater/vent. And it’s not that cold in SF during the winter!
Wow – that bathroom project really turned out well. That was an added benefit by missing 3 1/2 weeks of the construction.
We have a kitchen remodel ahead of us to consider. Our foot print will probably be increased by about 75 to 100 SQ and will allow us to re-align most of the flow and layout. In our area we are looking at about $35k – $50k for the total project.
I guess in the end, taking longer to do things right is better. But, during the process, my contractor was so inefficient. It was a joke, really. If I ran my business like that, I would surely fail.
Good luck on your project! Where are you located?
A year after graduating from college, I bought a 3700 square feet duplex/triplex range. So it’s a spread out enough where I can still have privacy. Tenants would pay for everything, and in still get to live in the main part of the house. Same amount as I would pay my dad while I was in college, but upgraded house, where I have my own 3 beds, 2 baths. Rent out 3 beds and 3 bath portion. I often joke my master bedroom is bigger than a 2 bedroom condo in Manhattan. It’s true!
The key is don’t live in a high cost living area, where every inch of land cost and arm and a leg. :)
Now that is an impressive size house. How long after college did it take for you to buy?
If having a big house is important to you, then you should not live in a high cost area, this is true. There are more opportunities and much higher salaries in high cost areas though, and if you can live frugally you can save much more that way.
Wonderful bathroom! I do love the look of waterfall fixtures. The article did bring two snarky thoughts to mind:
First, I see from your first picture that your contractor uses the wonderful 2×6 style of scaffolding! I saw my in-law’s neighbor’s house (in Houston) go up entirely using boards slung between ladders. Except for one day, suddenly there were real scaffolds on the house. Of course, this was “surprise inspection” day. The next day, those expensive scaffolds were back at the equipment rental place.
Next, I feel so sorry for you to have that great bathroom in the middle of the California drought! Enjoy it before your water is turned off!
OK, now to represent the Midwest viewpoint again: the math is entirely different if your neighborhood is $120 / square foot. (and this has appreciated by 50% since I bought the house–a very nice, pretty big place) You would be losing 50%! I think it’s these extreme differences that make national magazine articles about home improvement into useless, averaged rubbish, claiming that good returns are 95% at best. Your results may vary–widely! It also makes us scoff at the supposed value increases shown on home improvement shows: “they must have not included labor!” “There’s some trick!”
We just have to do things out of love; or, more cerebrally, an expectation of enjoyment and utility for the time we will spend in the house.
Love your blog. This is my first comment.
Great design. Heated anything in a bathroom is the best money you can spend. These construction cost differences between areas amaze me especially materials and permits! I am shocked when I hear renovation costs in NYC, LA, SF etc. In Ohio I was able to do an addition (325 SF) for 47k. Now I did do a lot of the work myself. New kitchen & first floor laundry. As for time, I’d be surprised if anyone can find a small contractor that ever gets a job done on time. If they get a call from their buddy and can do a small job that day and get cash they are not showing up on your project. My project took 6 months from ground breaking to occupancy.
Cost – I always put a huge contingency line item in my budget especially when remodeling. You never know what is going to be behind the walls or what kind of mood the inspector will be in. If possible I always try and buy the materials for contractors to install to save on markups. Also don’t wait for the contractor to bring up delays, get a schedule from them and monitor it. If it’s taking longer than expected have a talk about it. Like you say don’t let them hold you hostage. Don’t fall for the pay a bunch of money upfront. I know way too many people that have been in small claims court trying to get deposits back.
I guess it all depends on what’s built in the space. A 300 sqft room is different from a 300sqft kitchen or bathroom. Well done being so handy!
I’m thoroughly incompetent in doing my own remodeling. If I owned a really inexpensive house, probably. But this house takes up decent amount of my net worth.
How much is your house in Ohio? The survey questions try to keep things in perspective.
My house is worth around 360k or $135 SF. I understand labor is more expensive in high cola cities but some numbers just astonish me. And regarding permits and fees, the cities’ plans examiners and inspectors must do really well or the city sees it as an easy revenue stream.
You can see pictures of the addition on my houzz page:
https://www.houzz.com/ideabooks/51303439
Wow, that’s a fantastic master bath. I can’t let Mrs. RB40 see this post. Our bathrooms are tiny contractor grade bathrooms… Once we move into our duplex, I would feel more liberal about upgrading. We’ll do the basement first, though.
She’s already e-mailing me!
Working on the basement first sounds like a good idea. Lots of unfinished space to enjoy!
Looks great! I recently undertook a shockingly similar project but didn’t have to pay for labor except for drywall finishing and the electrician, ball park cost was ~10-12k. I also was able to add another window on the view facing side of my house, which is a cool added bonus both for views and for afternoon breezes.
It’s weird now sometimes I’ll be staying at a 4 or 5 star hotel missing my bathroom at home.
Money and time well spent
Nice work! How long did it take you?
The inspectors here in SF at least won’t sign off on any electrical work (they come 3X) if a licensed electrician doesn’t do the work.
It was mostly complete in around a month. The few finishing exterior touches took a bit longer. The secret to this is having a very talented father-in-law who was willing to work 12+ hour days, 6 days/week for a month! My meager contributions paled by comparison. I was happy to have my evenings and weekends back though.
Great job whipping your skilled father in law to do all the work and then take the credit!
Hope he paid for most everything too! Lol
that would have been crossing the line!
Man, that bathroom looks amazing. I would love to update our old 1960’s one to that level, but it’s not in the budget cards at the moment.
Amazing remodel. The new bathroom looks like a dream. A lot nicer than my ~50sq ft main bath for sure!
That’s one insanely awesome bathroom. Just bought my home 2 years ago. Only has one tiny awkward bathroom. It will be updated in a couple years. First the downstairs then kitchen. Baby steps.
I agree, purchasing anything that has a short life bothers me. the shorter it is, the more it bothers me. That bathroom will last decades while looking great and adds huge value to the home that wont soon diminish. That car starts looking old by 5 years and seems ancient after 10 with most of its original value gone at 15 years.
Baby steps is right, otherwise, you might get into a lot of fights with your partner, especially if you are living through the remodel.
I plan to do two decks and sliding doors next at the end of the year or early next year. Will give time to save some money and recharge.
“I had no sympathy because he and his crew hardly did any work for the entire 3.5 weeks I was in Asia. Instead, the contractor let slip one day that he ended up building a whole restaurant during the time he was supposed to build my bathroom, even though he told me he had no other projects he was working on. WTF. He used the excuse that his helpers were injured as the reason why they didn’t work. What was daily work became visiting once a week for a couple hours at a time.”
It looks like nobody is ever on schedule with construction projects. Did you GC this yourself or did you hire one and put a contract into place? I’ve noticed that adding a liquidated damage clause helps tremendously in pressuring the contractor to finishing closer on time.
I did the GC myself. I’ve build a bathroom before in my old house and have gone through the permit process, so I figure I’d just do it again since I knew what to expect.
Because I finished the upstairs, I could live in the upstairs while they worked on the downstairs. My other house had all the main bedrooms upstairs, and I was building a bathroom upstairs, so it wasn’t ideal. But, that bathroom construction only took three months.